|
When do I need to use Optimumcut-1D LITE ? |
|
When do I need to use Optimumcut-1D Lite ?
At estimating and sales stage
In order to ensure that you have not over estimated materials for a new project. Materials optimization of your projected materials schedules would at estimating stage ensure that your tendered price for a project would be competitive.
At buying stage
Ensure you have not over-ordered materials for a project by optimizing your project materials schedules. By optimizing materials at this stage you will ultimately notice a reduction in any of your stock holdings. The ultimate solution would be to order your materials requirements to suit each specific project therefore achieving a maximum yield with minimum waste.
At manufacture and production stage
To ensure you make the optimum use of your materials ordered, optimize your materials schedules and provide easily understandable graphically displayed cutting lists and bar reference labels to be read in full conjunction with bar referenced workshop assembly drawings.